Login / Register
Home/Industries

Industries we source for

The same fifteen categories serve very different plants. What changes is which details matter — and which ones get missed. Here is what we watch for in each sector.

Manufacturing

Panel builds, line spares, drives and control gear, plus the MRO and tooling that keep a plant running.

Where it usually goes wrong: Mixed makes across one panel that must still satisfy a single approval.

NX-FANX-ELNX-IS

Automotive

Line automation, robotic cells, safety guarding, conveying and the spares that keep takt time.

Where it usually goes wrong: A line stopped for a spare that was never cross-referenced before it failed.

NX-FANX-MSNX-IM

Defence & PSU

Origin-compliant supply, GeM and tender-linked procurement, documented traceability end to end.

Where it usually goes wrong: Country-of-origin or make-list conditions discovered late in an order.

NX-SCNX-NWNX-IT

Railways

Signalling-adjacent power, surveillance, hardened networking and depot infrastructure.

Where it usually goes wrong: Approved-vendor and RDSO conditions surfacing after the technical bid.

NX-ELNX-SCNX-IN

Power & utilities

Switchgear, protection, metering, substation instrumentation, UPS and power quality.

Where it usually goes wrong: Make-lists on tenders that disqualify a quote after the fact.

NX-ELNX-PINX-EP

Oil, gas & process

Hazardous-area instrumentation, process valves and actuators, flameproof enclosures, gas detection.

Where it usually goes wrong: Zone and gas-group certification missed at enquiry stage.

NX-PINX-PVNX-SP

Steel & metals

Bearings, gearboxes, hydraulics, heavy material handling and the wear parts that go with them.

Where it usually goes wrong: Long-lead drive and gearbox spares ordered only once the mill is already down.

NX-MPNX-HPNX-OS

Cement

Conveying, crushing and mill drive components, dust extraction and plant utilities.

Where it usually goes wrong: Abrasive-duty parts quoted to a general-industry specification.

NX-MPNX-MHNX-FI

Mining

Material handling, hydraulics, hardened electricals, PPE and site infrastructure.

Where it usually goes wrong: Site-condition ratings assumed rather than specified at enquiry.

NX-MHNX-HPNX-SP

Pharmaceuticals

Instrumentation, validated utilities, cleanroom-compatible fittings, HVAC and calibration.

Where it usually goes wrong: Certificates and validation paperwork requested after delivery instead of at enquiry.

NX-PINX-FANX-FI

Food & beverage

Packaging machinery and consumables, conveying, coding, inspection and end-of-line handling.

Where it usually goes wrong: Machines quoted without the changeover parts or spares they will need.

NX-IMNX-MHNX-FA

Infrastructure & EPC

Distribution, lighting, cable management, HVAC and power backup across project packages.

Where it usually goes wrong: Package BOQs priced line-by-line with no view of the delivery sequence.

NX-ELNX-FINX-EP

Data centres

Compute, storage, network fabric, racks, PDUs, precision cooling and containment.

Where it usually goes wrong: Configurations quoted against the wrong SKU generation.

NX-DCNX-ITNX-NW

Enterprise IT

Server and endpoint refresh, networking, firewalls, surveillance and access control.

Where it usually goes wrong: Refresh cycles procured piecemeal until nothing on site is a matching generation.

NX-ITNX-NWNX-SC

Government & PSUs

GeM and CPPP procurement across every domain, with the documentation the bid actually requires.

Where it usually goes wrong: Technically compliant bids rejected on paperwork rather than on price.

NX-ELNX-ITNX-SC

Not listed, or spanning several?

Most real requirements do. Send the list — we source across all fifteen categories regardless of sector.

My requirement list 0